  1. Post Irma Report

    Lehigh Acres MSID | Page

    recommended short term projects to remove impediments to flow and proposed conceptual long term projects for ... sedimentation, collapsed or nonfunctional culverts, etc.) to flow and lack of time available to drain flood ... data of existing land improvement projects for identifying study areas of high importance. Rainfall ...

  2. Board of Commissioners Regular Meeting

    Board of Commissioners | Calendar Event | 12/14/21 06:00pm

    Enterprises for the S-VL-1 Weir Replacement Project. Approves the contract and allows the contractor to begin ... Phase III Project on time and within budget. Subject: Structure Varsity Lakes 1- Notice to Proceed Move ...

  3. CREST Phase III

    Lehigh Acres MSID | Page

    The CREST Phase III project is currently out to bid until April 11, 2024. CREST Phase III Plans ... HOOVER, CDO (SEAT �) PROJECT CONSULTANTS: ENGINEER � S8RVEYOR: ENGINEER OF RECORD AI0 ENGINEERING ... Text PROJECT LOCATION INFORMATION: �0 �0 0 �� �0 0 20 �0 0 2� �0 0 30 �0 0 30 �0 0 CARACARA NESTING ...

  4. Richmond Ave Bridge

    Lehigh Acres MSID | Page

    sidewalks in seven neighborhoods, clear five canals; and replace the Richmond Avenue pedestrian bridge over ...

  5. Plant Control Technician

    Lehigh Acres MSID | Job Opening

    and concrete. Removes and replaces signs including but not limited to traffic, park and trespassing. ... Replaces worn or damaged parts such as hoses, wiring, and belts, in machines and equipment. Cuts grass and ... and replaces signs including but not limited to traffic, park and trespassing. Replaces worn or ...

  6. Plant Control Technician

    Lehigh Acres MSID | Job Opening

    and concrete. Removes and replaces signs including but not limited to traffic, park and trespassing. ... Replaces worn or damaged parts such as hoses, wiring, and belts, in machines and equipment. Cuts grass and ... replaces signs including but not limited to traffic, park and trespassing. Replaces worn or damaged parts ...

  7. Moving Water South Phase II

    Lehigh Acres MSID | Page

    Stormwater Master Plan (SWMP) in order to identify and prioritize projects to enhance future stormwater ... storage deficits within LA-MSID. Moving Water South, Phase II was identified as a top priority project to ... River, resulting in a reduction of nutrient loading. This a complementary project with the State Road 82 ...

  8. Southwest Lehigh Weirs

    Lehigh Acres MSID | Page

    SW Lehigh Weirs Project Regionally-Beneficial Stormwater Project: Southwest Lehigh Weirs ... (A.B.S.O.R.B) Progresses The project will help achieve water quality and stormwater storage benefits for ... River Basin (A.B.S.O.R.B) project, provides construction of 25 weirs in Lehigh Acres through ...

  9. Frank Mann Preserve (Section 10) Project

    Lehigh Acres MSID | Page

    The Frank Mann Preserve (Section 10) Project is a partnership project co-managed by Lee County ... project (see below) for Frank Mann Preserve proposes to reconfigure an existing mine lake into a filter ... into the Greenbriar Swamp for extending wetland hydro-periods. This conceptual project controls flow in ...

  10. CREST Phase II Project

    Lehigh Acres MSID | Bid/RFP

    “CREST PHASE II PROJECT" Awarded to Turnbull Environmental, Inc. NOTICE IS HEREBY GIVEN:  ... slide gates,  rip-rap stabilization, fencing, and site restoration at the project site located at 7875 ... Wheeler Road, LaBelle, FL 33935, as depicted on the projects drawings. A payment in cash or check payable ...